We Build the Future in Every Project!
Contact Us»Take a Look at Our Projects Now
Discover our projects that we have developed with years of experience in the construction industry.
Completed Projects»
Ongoing projects »Contact Us
Let's shape your dreams together
Contact Us»
Drinking water networks
STATE ROADS MOTORWAYS
TUNNEL-BRIDGE-VIADUCT
HOUSİNG PROJECTS
Our projects
Filter Categories
Filter - All
Completed Projects
Ongoing Projects
CNAIR S.A Modernization DN71 Baldana – Targoviste – Sinaia, Km 0+000 – Km 44+130 Large 4 Gasoline Circulation And Km 51+041 – Km 109+905 Drum “Sector 1: Baldana – Targoviste Km 0+000 – 4 Kilometers 44+ 130 Kilometers Circulation
CNAIR S.A Modernization DN71 Bâldana-Târgoviște-Sinaia Km 0+000 - Km 44+130 Widening To 4 Traffic Lanes And Km 51+041 - Km 109+905 Two-Lane Road" Sector 2: Târgoviște-Sinaia Km 51+041- 109+905- 2 Lane Road
One Floreasca Towers 40,000 M2, 208 Houses, Bucharest / Romania
EARTH WORKS, ARTWORKS, B.S.K (BITUMINOUS HOT MIXTURE) CONSTRUCTION WORK ON VARIOUS SECTIONS OF BALIKESİR-HAVRAN-KÜÇÜKKUYU ROAD AND EDREMIT RING ROAD.
ÇANAKKALE ÇAN PICKLING WORK
WORK OF KASTAMONU-VEHICLE ROAD (KM: 0+000-38+000) EARTH ART STRUCTURES, SUPERSTRUCTURE (BITUMINOUS HOT MIXTURE (B.S.K), CARGUARDS AND TRAFFIC WORKS.
BURSA-İNEGÖL-BOZÜYÜK-4. REGIONAL BORDER ROAD BETWEEN KM:81+700-100+256;0+000-17+380 AND SÖGÜT DIVISION BRIDGE JUNCTION CONSTRUCTION WORKS OF ARTS STRUCTURES AND B.S.K (BITUMINOUS HOT MIXTURE).
MERSİN-ADANA STATE HIGHWAY, EARTH WORKS, ARTWORKS, SUPERSTRUCTURE (HORIZONTAL AND DISTRICT) BETWEEN ATİLLA ALTIKAT DIFFERENT LEVEL INTERSECTION AND KM:59+290.68+750 (HIPODRUM INTERSECTION-HİLTONSA INTERSECTION) USEVA MARKING, RAILWAY) WORKS CONSTRUCTION.
ESTABLISHMENT OF ICE DETECTION AND PREVENTION SYSTEM AT THE ENTRANCES AND EXITS OF THE DRAIN TUNNEL AND BASIN TUNNEL.
CONSTRUCTION OF SİVRİHİSAR-ESKİŞEHİR-BOZÜYÜK ROAD WEARING LAYER (BETWEEN KM: 291+730-297+100) AND (ESKİŞEHİR-BURSA) SEPARATION. (KM: BETWEEN 00+000-2+500) SOIL LEVELING, ARTWORKS, BRIDGE, SUPERSTRUCTURE AND B.S.K WORKS CONSTRUCTION WORK.
EARTH WORKS, ARTWORKS, PMT AN PMAT AND BSK HOT BITTUM MIXTURES CONSTRUCTION BETWEEN KASTAMONU AIRPORT JUNCTION KM: 0+000-6+000, CONSTRUCTION OF WEARING ON THE EASTERN RING ROAD, CONSTRUCTION OF UNDERPASSES TO THE EASTERN RING ROAD CONNECTION JUNCTION AND PIUPIL VILLAGE ENTRANCE.
KASTAMONU PROVINCIAL BORDER - KARABÜK ROAD.
KAKLIK (DENIZLI) LOGISTICS CENTER. ADDITIONAL FIELD CONCRETEMENT, DRAINAGE CHANNELS, RETAINING AND DETERMINATION WALL, LOADING RAMP LOGISTICS SERVICE BUILDING, EXTENSION OF CURRENT PERONS, CONSTRUCTION OF CENTERS AND 3 SECURITY HOUSES.
750-11 KKNO STATE ROAD AKSARAY CITY CROSSING TACİN UNDERPASS AND INTERSECTION REGULATION CONSTRUCTION WORK.
FOUNDATION REINFORCEMENT AND SURFACE COATING WORKS TO BE CARRIED OUT ON ORDU-NİKSAR BRANCH CHIEF ROADS WITHIN THE BORDERS OF 7TH REGIONAL DIRECTORATE OF HIGHWAYS.
7719 BLOCK 23 PLOT REINFORCED CONCRETE FRAME SYSTEM TOTAL CONSTRUCTION AREA 4184.59 M2 BUILDING CLASS 3/B.
BITUMINOUS HOT MIX CONSTRUCTION WORK OF AKSARAY NEVŞEHİR JOINT ROAD BETWEEN CAMİLİİÖREN-GÜLPINAR-GÜLAĞAÇ.
Kozan-Feke-Saimbeyli-6BlHdRoad Km:2+000-70+151G/66+560İ-82+300 Earthworks, Art Structures And Superstructure (Plentmix Subfoundation, Plantmix Foundation, Surface Coating) Works (SUPPLEMENT) Construction.